You know, the original Francis Scott Key Bridge took 10–15 years to plan and another 5 years to build. Rebuilding it now isn’t a simple task - crews had to clear massive wreckage, navigate environmental reviews and federal permitting, and complete complex engineering prep. A design-build team was selected in late 2024, and full construction is expected to finish by late 2028. This 1.6-mile structure must meet standards for safety, ship clearance, and resilience. It’s not a quick fix - it’s a multi-billion-dollar, full-scale rebuild.
 
	 
 
	But let’s be real - facts don’t matter to you. You dragged this thread back from the dead just to use the bridge as a cheap distraction from the catastrophic failures of Trump 2.0, you being conned once again, and to smear a governor who’s actually doing the work simply because he’s black.
 
	 
 
	People see right through this garbage. It’s the same recycled outrage, fed by the same incel-driven fake news ecosystem designed to keep infected people like you completely divorced from reality.